Deutsch English
DHL Air Hub, Leipzig, Germany
Employer / Designer
Client:
Deutsche Post Grundstücks-vermietung GmbH & Co KG, Bonn
Project Controller:
Deutsche Post Bauen GmbH, Schkeuditz
Architect:
Goebel Architekten Assoz. /
Deutsche Post Bauen GmbH,
Schkeuditz
Deutsche Post Bauen GmbH,
Schkeuditz
Project data
Technical costs:
27 million EUR
Construction costs:
120 million EUR
GFA (total):
126 000 sq. m
Project description
- Hangar for 2 Airbus A380 or 4 MD11 with maintenance shop and administration building, approx. 220 m x 100 m area
- Operations building with 2 levels for mail sorting and utilities, approx. 400 m x 100 m area
- Administration building with maintenance shop and locker rooms