ALTANA PHARMA, Oranienburg, Germany
New extension of tablets production – administration building

picture

Employer / Designer

Client: ALTANA Pharma, Oranienburg
Architekt: HWP Stuttgart

Project data

Technical costs: 8.35 million EUR
Construction costs: 15 million EUR
GFA: 14 700 sq. m
GCV: 90 000 cu. m

Project description

  • Demineralized water supply
  • Central compressed air
  • Waste water neutralization system
  • Distilled water warm and cold
  • Air compressor
  • Steam generator (for production + HVAC)
  • 2 NH3-Cooling machines (2 MW)
  • HVAC-System total 325 000 cu. m/h
  • Pressure control for production areas
  • Production of ultrapure water